98,000 KWH
Sunpin Solar
Imperial County,CA
The 98 MWdc Titan Solar 1 Energy Project is Sunpin Solar’s second large utility-scale solar project in Imperial Irrigation District (IID) territory following its successful development of the 75 MWac ColGreen North Shore Project in 2018. The project is situated on a 569-acre parcel between the beautiful Salton Sea and Anze Borrego Desert State Park in Imperial County, California. It reaches the commercial operation date on December 18, 2020. The single-axis tracking solar project will generate over 218,000 MWh annually, which is enough to power over 26,900 homes annually.
The 98 MWdc Titan Solar 1 Project brings clean renewable energy to the community, as well as hundreds of short and long term jobs. The annual energy production of the project is equivalent to:
265 Franklin Street, Suite 1702 Boston MA 02110
542-0081 2-6-3 Minamisenba, Chuo-ku, Toho 2nd Building, Room 601 Osaka City, Japan
Copyright © 2025 Sunpin Solar. All rights reserved.